Manchester and Salford have one of the busiest tower pipelines outside London, and reinforcement gangs are in demand across the city. We supply and fix reinforcement for reinforced-concrete frames, substructures and civils on major projects in Manchester, delivered to programme by carded steel-fixing gangs.
Also nearby: Liverpool · Sheffield · Leeds

Working from your engineer’s drawings, we take on reinforcement across residential tower clusters, build-to-rent and student accommodation frames in Manchester, from bar bending schedules and cut and bend supply through to fully fixed cages presented clean for inspection.
Placing and tying reinforcement to slabs, columns, walls, cores and beams on major projects across the UK.
S/02Cut and bend reinforcement supplied to BS 8666, with bar bending schedules prepared from your drawings and deliveries phased to suit your pour sequence.
S/03Reinforcement to cores, columns, slabs and stairs for reinforced-concrete frames on high-rise, commercial and residential structures.
S/04Reinforcement to foundations, rafts, pile caps, ground beams and basements, getting the structure right below ground before the frame goes up.
S/05Mechanical splicing and rebar couplers for continuity at construction joints, kickers and heavily congested connections.
S/06Carded steel-fixing gangs supplied to your site, resourced to the programme and managed by experienced supervisors.
In and around Manchester (M1) we work on residential tower clusters, build-to-rent and student accommodation frames. From cut and bend supply to fully fixed cages, we take on the reinforcement package for main contractors and developers building near Deansgate.
Yes. We mobilise carded steel-fixing gangs to Manchester, resourced to your programme and run by experienced supervisors. Whether you need a supervised gang or extra fixers under your own supervision, we can cover it.
Yes. We can schedule and supply cut and bend reinforcement to BS 8666 and fix it to your drawings as a single package, so there is one team accountable for reinforcement on your Manchester project.
It depends on the scale of the package and what else we have running, but we resource to your programme and ramp gangs up as the frame demands. Manchester and Salford have one of the busiest tower pipelines outside London, and reinforcement gangs are in demand across the city. Send us the programme and we will tell you what we can commit to.
Yes. That is exactly the kind of work we take on in Manchester. We fix reinforcement to BS 4449 / BS 8666 and present each pour clean for inspection, working alongside your groundworks, concrete and formwork packages.
Send us the drawings and programme and we will come back to you.
Tell us the project, programme and scope, and whether you need supply, fix or both. We will come back to you.