Reinforcement to cores, columns, slabs and stairs for reinforced-concrete frames on high-rise, commercial and residential structures. We resource the reinforcement element of the frame so the concrete programme keeps moving floor after floor.

Core walls and stair reinforcement fixed ahead of the slab, keeping the jump form or crane moving.
Column starters, kickers and wall cages tied plumb, with couplers at construction joints.
Floor-by-floor slab reinforcement fixed to the deck cycle, mats, chairs and spacers set true.
Reinforcement resourced to the frame cycle so the pour is never waiting on the steel.
We mobilise carded gangs to major project sites nationwide. A few of the cities we cover:
Yes. We resource the reinforcement to the deck cycle so each slab, core and column pour is fixed and inspected in step with the frame, floor after floor.
Yes. Lift and stair cores are commonly fixed ahead of the floor plates to keep the jump form or crane moving, and we plan the gang around that sequence.
From low-rise commercial and residential frames through to high-rise towers, working alongside your groundworks, concrete and formwork packages.
Yes. We install mechanical couplers and continuity systems at kickers and construction joints so the frame stays structurally continuous between pours.
Send us the drawings and programme and we will come back to you.
Tell us the project, programme and scope, and whether you need supply, fix or both. We will come back to you.